There will be planned required maintenance being performed on our (KVM2) Montreal, QC KVM VPS server.
Expected downtime: 1 hour
Expected time frame: 1am-2am Sunday, November 29th 2020
After the maintenance is performed, bandwidth will be upgraded from 250Mbps to 500Mbps.
Thursday, November 26, 2020