There will be planned required maintenance being performed on our (KVM2) Montreal, QC KVM VPS server.

Expected downtime: 1 hour

Expected time frame: 1am-2am Sunday, November 29th 2020

After the maintenance is performed, bandwidth will be upgraded from 250Mbps to 500Mbps.



יום חמישי, נובמבר 26, 2020





« חזרה